There's not a whole lot to show this week, although quite a lot of work has been done. The most obvious thing is the new holes and trenches that have opened up in preparation for the drainage/sewage system.


We were required to have an archeologist present when these holes were opened. Fortunately, there was nothing of interest under the floor, so construction can continue.

There is also a lot of work going on the prepare the walls for the installation of the next floor and stairs. It's not particularly obvious in these pictures, but it has been busy on the worksite. the board attached to the wall in the picture below shows where the second floor stairs will go.  The walls also had to be cleaned of the old plaster coating because we will be leaving the stones exposed in the bar area.